Land
Development Engineering |
 |
|
| |
 |
|
|
Whether designing a residential subdivision or a multi-feature
resort recreational complex, CCTA's feasibility analyses,
design services, construction inspection, permits and approvals'
stewardship ensure successful outcomes.
CCTA plans complete detailed design, manages and inspects
construction of site services for residential, industrial
and municipal land development projects such as:
- Individual lots
- Residential subdivisions
- Business parks
- Resort recreational developments in sensitive settings
|
|
|
|
Infrastructure Design: Intrawest Resort, Blue Mountain
CCTA developed the site services design for Intrawest Blue
Mountain's 1,200 unit, four-season development.
Features
- Snow-making water supply works upgrade
- Centralized multi-function pond
- Surface and stormwater collection and treatment system
- Wastewater collection
- Potable water distribution
- Earth works
- Roads
- Parking lots
|
Technical
analysis
Field
studies
Preliminary
and detail design
Public
Agency consultations
Approvals
Tendering
Construction
inspection
Commissioning
Performance
monitoring
Annual
evaluations and reports
|
Land Development in a Rural Setting: McIntyre Creek,
Wasaga Beach
McIntyre Creek is a new 292 unit residential complex, with
a golf course and several watercourses in a park-like setting.
CCTA provided project management from raw land through to
construction, designing efficient infrastructure facilities
that blend with the landscape.
Features
- Roads
- Drainage
- Stormwater management systems
- Water supply and distribution systems
- Lot designs
|
Subdivision
agreements
Field
studies
Preliminary
design
Detail
design
Approvals
Tendering
Construction
inspection
Commissioning
|
Water Services Planning: Charter West Ridge Development,
City of Orillia
Phase I of this development includes 392 residential units
and 20 hectares of commercial development. Located near the
intersection of two busy highways it will eventually include
up to 4,250 residences and a 125 hectare industrial complex.
Features
- Traffic impact analysis
- Stormwater management
- Sanitary sewage collection, including trunk connection
with pumping station
- Water distribution system planning
- Roads and services
|
Preliminary
engineering studies in support of planning applications
Water
distribution analysis
Final
design, contract administration and inspection for Phase I
and highway improvements
Services
planning
Stormwater
management planning and design
Preliminary
and detail design
Construction
inspection
|
Residential Subdivision in an Urban Setting: River Edge Subdivision: Town of New Tecumseth
Phase 1 of this development includes 83 single family and 48 townhouse residential units within the Alliston Secondary Plan Area.
Features
- Traffic impact analysis
- Stormwater sewage collection, including 600 m of trunk sewer, a crossing of the Canadian Pacific Railway right-of-way, a 110L/s temporary sewage pumping station and associated forcemain
- Water distribution, including 600 m of trunk watermain and a crossing of the Canadian Pacific Railway right-of-way
- Bridge crossings (sanitary forcemain and trunk watermain)
|
|
Residential/Business Park Development, Trillium Forest Subdivision: Town of Wasaga Beach
The project involves 195 residential units and 14 commercial blocks, services by approximately 4.0 km of roads, sanitary sewers, storm sewers and watermain, as well as a stormwater management facility servicing a 150 ha drainage basin and a stormwater management diversion structure servicing a 350 ha drainage area. The total estimated construction value is $5.0 million. The project involved intersection improvements on Highway 26. The final phase is currently under construction.
Features
- Traffic impact analysis
- Highway 26 intersection improvements
- Stormwater management
- Sanitary sewage collection
- Water distribution
- Green space development
|
|
| |
NEXT>>>
|
|
|