East End Sanitary Sewer Needs and Servicing Study,
Town of Collingwood
CCTA evaluated and planned a sewer system that accommodates
development in the east end industrial lands of the Town of
Collingwood. CCTA analysed the existing trunk sewer system,
identified why it is surcharging and recommended solutions
for its premature overloading. The client is acting on CCTA's
recommendations in its new sewage servicing master plan.
Features
- Detailed sewage flow monitoring correlated with rainflow
data
- Nine alternative servicing scenarios
- System modeling and scenario comparison
- Recommendations for short and long-term servicing solutions
|
Condition
evaluations
Flow
monitoring
Data
collection and analysis
Computer
modeling
Alternative
solutions
Reporting
|
|
Sanitary Sewer System Assessment, City of Vaughan
CCTA monitored flows in sewersheds of the City's trunk sewers
to predict if the system could accommodate increased usage
by new residents in massive local housing developments. Our
staff collected data over two years to establish actual sewage
flow rates. We modeled estimates of future generation and
inflow/infiltration contributions as a basis for planning.
Features
- Sewage system capacity assessment
- Monitoring and data collection at 15 sites in 3 sewersheds
- Actual sewage flow figures
- Sewage generation rate estimates
- Inflow/infiltration contribution estimates
|
Monitoring
program set-up and maintenance
Data
collection and analysis
Computer
modeling
Reporting
|
|
Servicing Opinion Report for Blake Cassels and Graydon,
Law Society of Upper Canada
CCTA produced an expert opinion report and provided expert
testimony at a lengthy trial before the Ontario Court of Justice,
General Division. Our analysis was based on an exhaustive
review of documents about the subject property, a complex
land development project near Toronto. CCTA's analyses and
advice were key ingredients in the client's successful defense.
Features
- In-depth review of complex project history
- Expert Opinion Report
- Expert testimony at trial
|
Detailed
review of pleadings, files, reports, site conditions and project
history
In-depth
report on technical issues Team
consultations, input to defense strategy In
court observations, analysis and evidence
|
|
Opinion on Wastewater Treatment Plant/System, Ontario
Hydro
Ontario Hydro retained CCTA to report on difficulties at its
wastewater treatment plant at the Bruce Energy Centre. CCTA
produced an expert opinion report and expert opinion advice
at trial, assisting the corporation in a successful legal
defense before the Ontario Court of Justice, General Division.
Features
- In-depth review of project design and operation
- Expert Opinion Report
- Expert testimony at trial
|
Detailed analysis of:
Memoranda
Letters
Diaries
Reports
Discoveries
|
|
Expert Advice before OMB on Servicing Capacity, Malone
Given Parsons Ltd.
CCTA provided expert advice for mediation before the Ontario
Municipal Board (OMB) on behalf of the Camperdown Area Landowners'
Group. At issue was the available and possible servicing capacity
in The Town of The Blue Mountains for a massive development
proposal. With detailed knowledge about the area and its infrastructure,
CCTA accurately assessed the Town's predictions, and helped
devise sound positions and alternatives.
Features
- Expert Opinion Reports
- Expert testimony before OMB
- Team consultations and strategy development
|
Detailed
review of files and report
Data
analysis Strategy
derivation
Expert
opinions Mediation
session
|
|
Utility Services Study for Bruce Energy Centre,
Willms & Shier for Ontario Hydro and Township of Bruce
CCTA evaluated the infrastructure available at a planned industrial
development that receives utility services from Hydro's Bruce
Energy Centre. At issue was the technical fitness and market
value of the utility services infrastructure. CCTA advised
the Township about potential acquisition strategies.
Features
- Detailed system evaluation
- Financial analyses
- Future servicing requirement models
- Recommendations for consideration
|
Project
direction
Strategic
discussions
Analysis
of alternative solutions
Report
|
|
Phase I Servicing Review, Ontario Ministry of Municipal
Affairs
Pressures for significant growth in parts of southern Ontario
in the early 1990s were a major challenge for local governments.
The feasibility and costs of water and sewage servicing were
of particular concern. An inter-ministerial committee was
established to recommend technically and economically feasible
strategies to accommodate predicted growth. CCTA completed
a comprehensive study of municipal water and sewage works
systems in a large band of land surrounding the GTA, stretching
from Brantford to Barrie.
Features
- Reviewed system data for all the communities ranging in
size from small villages to the Kitchener Waterloo region
- Inventoried demand, total and available capacity
- Inventory of expansions and improvements
- Predictions of systems' capacities for growth
|
Strategic
discussions
System
review
Planning
and implementation
Detailed
report on existing conditions, deficiencies and growth potential
|
| |